I need a 51.25m wall constructing from blockwork to be 1.8m high.
The foundations need digging to 60-90cm below the current surface.
This is to butt up against an existing single block (60-90cm retaining) wall to make a double block wall
I need a 51.25m wall constructing from blockwork to be 1.8m high.
The foundations need digging to 60-90cm below the current surface.
This is to butt up against an existing single block (60-90cm retaining) wall to make a double block wall