1. Construction of a concrete pad to take a hot tub about 250cm square. To move garden bed then to dig down 8 inches, steel mesh (if required) to be level with surrounding ground and edged with slabs. To work with electrician for plug and lighting.
2. Separately, to build up four steps in garden co 1m wide using brick or stone.